Evidence-led diagnostics. A defined retrofit path.

For boilers, turbines, generators, control and emissions systems, first establish the problem, data and scope, then compare operating adjustments, maintenance and equipment retrofits.

Start with the problem you are facing.

Choose an equipment issue to explore the checks, corrective options and deliverable documents.

01

Boiler combustion, efficiency and fuel flexibility

When fuel, output or exhaust conditions change, first verify the calculation inputs and operating limits.

Explore boiler equipment and components

Key checks

  • Fuel analysis, steam parameters, typical loads and heat balance
  • Heating surfaces, air preheater and auxiliary equipment records

Corrective options

Compare combustion adjustments, heating surface and auxiliary equipment work, and fuel flexibility retrofits. Define the interfaces with emissions control systems.

Deliverable documents

Boiler issue list, calculation review, corrective proposal and test requirements

02

Turbine performance, heat supply and vibration

Analyze changes in output or heat demand using steam conditions, off-design calculations and site records.

Explore steam turbine services

Key checks

  • Inlet, exhaust and extraction steam conditions, load profiles and thermal performance
  • Shaft vibration, steam seal and maintenance records, with additional checks where needed

Corrective options

Compare operating optimization, steam path and heat supply retrofits, and steam seal or shaft work. First confirm applicable operating conditions.

Deliverable documents

Performance and off-design analysis, evidence schedule and proposed retrofit scope

03

Generator matching, excitation and cooling interfaces

Review mechanical, electrical and cooling conditions against unit configuration and operating status.

Explore generator systems

Key checks

  • Nameplates, unit matching parameters, protection and excitation interfaces
  • Temperature and cooling records, alarms and maintenance history

Corrective options

Review unit matching, cooling and monitoring issues. Specify any specialist tests and the associated responsibilities.

Deliverable documents

Matching and interface checklist, condition issues and recommended checks

04

Control instability and emissions system coordination

Review coordinated operation and measurement data using DCS, DEH and other control records alongside emissions operating conditions.

Explore control and emissions systems

Key checks

  • Control logic, trends, alarms and measurement validity
  • Operating records for fuel, flue gas, particulate removal, desulfurization and NOₓ control

Corrective options

Compare control tuning, equipment work and emissions upgrades. Check energy use, emissions and interfaces with main and auxiliary equipment.

Deliverable documents

Control and emissions issue list, interface proposal and validation conditions

Prepare this information first.

If records are incomplete, explain the problem first, then agree on additional information and site tests.

  • Equipment model, nameplate and principal design parameters
  • Thermal system diagrams and main/auxiliary equipment documents
  • Operating records and trends for representative conditions
  • Alarm, maintenance and historical test records
  • Heat demand, operating objectives and available maintenance window
Download the information checklist

From an issue list to validation records

  • Data quality and existing operating boundaries
  • Issue list, evidence and recommended additional measurements
  • Comparison of operating adjustments, maintenance and retrofit options
  • Implementation priorities and performance validation requirements

Agree first on information scope, site test conditions and deliverables. Where data is insufficient, list additional measurements and limits on conclusions. Review recommendations against site conditions and verify retrofit outcomes under agreed conditions and methods. The technical agreement defines the final scope.

Prepare the issues for discussion

Agree how outcomes will be verified during proposal development.

Maintain comparable baselines, fuel and steam conditions, loads and measurement methods. No fixed energy saving percentage is promised.

  1. Information and boundaries

    Review equipment, measurement points, operating conditions and objectives. List missing data.

  2. Analysis and testing

    Combine calculation reviews with necessary site tests to establish issues and supporting evidence.

  3. Proposal and implementation

    Compare operating adjustments, maintenance and retrofits. Define scope and implementation conditions.

  4. Validation and handover

    Agree the baseline, test conditions, methods and acceptance requirements, and deliver validation records.

Diagnostics do not replace plant operating procedures, protection-setting approvals or equipment manufacturer requirements. Confirm the scope and acceptance conditions in the technical agreement.

Start with a specific engineering question.

Tell us about your equipment, operating conditions and objectives so we can identify the information and next steps required.