Power plant engineering services and equipment integrationCall +86 186 0166 1115

Distinct equipment. Coordinated systems.

From fuel and steam conditions to thermal, electrical, emissions and control interfaces, use calculation and verification to support equipment matching.

Boiler systems

Use fuel analysis and steam parameters for thermal calculations, connecting combustion, heating surfaces and auxiliary equipment selection.

CFB boiler building, chimney and adjacent buildings
CFB boiler system site
Power plant site, boiler building and cooling towers
Power plant site overview

Technical and selection priorities

Fuel analysis and boiler parameters → Thermal and combustion calculations → Heating surfaces, auxiliaries and layout constraints → Structural design and equipment selection.

Scope of work

  • Circulating fluidized bed and pulverized coal boiler systems
  • Heating surface and combustion system retrofits
  • Fuel flexibility and operating parameter analysis

Typical deliverables

  • Input conditions and thermal calculation reports
  • System configurations and equipment specifications
  • Interface drawings and validation requirements

Steam turbine systems

Analyze steam paths, off-design performance and heat supply matching around steam conditions and load requirements.

Complete steam turbine-generator set and turbine hall
Complete steam turbine unit at site
Steam path and steam seals inside an opened turbine casing
Steam turbine internals

Technical and selection priorities

Steam conditions and heat demand → Thermal, steam path and off-design calculations → Turbine and system configuration → Heat supply and operating matching.

Scope of work

  • Back-pressure, extraction/back-pressure, extraction/condensing and condensing units
  • Steam path and heat supply retrofits
  • Shaft, bearing and steam seal issue analysis

Typical deliverables

  • Thermal and off-design calculation documents
  • Steam path or heat supply retrofit proposals
  • Main/auxiliary interfaces and test requirements

Generator systems

Review the mechanical, electrical and operating interfaces of turbine-generator sets to support equipment matching and condition analysis.

Generator within its steam turbine-generator installation
Steam turbine-generator set at site

Technical and selection priorities

Power, speed and operating conditions → Turbine-generator matching → Excitation, cooling and protection interfaces → Equipment package specifications.

Scope of work

  • Synchronous generator packages
  • Excitation, cooling and protection interfaces
  • Operating monitoring and condition analysis

Typical deliverables

  • Unit matching and interface conditions
  • Package specifications and document schedules
  • Commissioning activities and operating recommendations

Control and monitoring systems

Translate process boundaries into control logic and monitoring requirements, with parameter tuning informed by site testing.

Technical and selection priorities

Process boundaries and measurement points → Control logic and interlock interfaces → Parameter tuning and commissioning → Trend and operating review.

Scope of work

  • DCS, DEH and SIS interfaces
  • Control strategies and parameter tuning
  • Performance monitoring and operating analysis

Typical deliverables

  • Control proposals and logic descriptions
  • Measurement point and system interface schedules
  • Tuning records and commissioning reports

Particulate removal systems

Review equipment configuration against flue gas and dust conditions, considering emissions targets and system pressure drop.

Technical and selection priorities

Flue gas flow, temperature and dust conditions → Particulate removal configuration and filter bag parameters → System pressure drop and interfaces → Operating validation.

Scope of work

  • Particulate removal configuration and interface review
  • Filter bags and associated components
  • System upgrades and operating issue analysis

Typical deliverables

  • Flue gas inputs and equipment selection criteria
  • System configurations and interface documents
  • Operating checks and performance validation proposals

Flue gas desulfurization systems

Use fuel and flue gas conditions to calculate desulfurization system boundaries and match main and auxiliary equipment.

Technical and selection priorities

Fuel and flue gas conditions → Desulfurization technology comparison → Equipment and utility matching → Emissions and energy use validation.

Scope of work

  • Desulfurization proposals and equipment packages
  • Flue gas and utility interfaces
  • Emissions upgrades and operating analysis

Typical deliverables

  • Design inputs and option comparison documents
  • Equipment schedules and interface conditions
  • Commissioning and acceptance conditions

NOₓ control systems

Analyze NOₓ control configuration and control interfaces against flue gas conditions, load variations and emissions requirements.

Technical and selection priorities

Flue gas conditions and load variations → NOₓ control configuration and catalyst interfaces → Main/auxiliary and control matching → Commissioning validation.

Scope of work

  • NOₓ control configuration and integration
  • Catalyst and associated equipment interfaces
  • Load flexibility and operating optimization analysis

Typical deliverables

  • Operating conditions and system proposals
  • Equipment specifications and control interface schedules
  • Commissioning records and validation requirements

Auxiliaries and system interfaces

Review main and auxiliary equipment against the plant thermal system. Consolidate equipment parameters, layouts and site conditions in an interface schedule.

Technical and selection priorities

Main equipment operating conditions and system demand → Auxiliary matching and selection → Piping, structural and instrumentation interfaces → Deliverable review.

Scope of work

  • Main/auxiliary matching and equipment selection
  • Piping, layout and utility interfaces
  • Spare parts selection and coordination of custom equipment

Typical deliverables

  • Equipment and system interface schedules
  • Layout conditions and package specifications
  • Delivery, installation and commissioning document schedules

Start with a specific engineering question.

Tell us about your equipment, operating conditions and objectives so we can identify the information and next steps required.

Discuss your project